Darlington Northern Link Road
The proposal would help to alleviate the current stress on the A1150 and A167 due to strategic traffic currently having to predominantly use these roads to access the A1 from Teesside.
Initially 2 routes were proposed – Route A which gave access close to Brafferton and Route B which passed through Skerningham.
Both routes were met with opposition. The ‘Say No to the Darlington Link Road’ (who were against both routes) and the ‘Barmpton & Skerningham Action Group’ (who were against route B only) were formed to oppose the proposal.
At the time the Northern Echo conducted their own online poll regarding the proposals for the road (the only one to have been conducted to date) the results of which are shown below. It resulted in an overwhelming 66% which said that neither option was preferred.
The Northern Echo online poll results 23rd December, 2017
The original Route A has now changed due to ground constraints with 3 options for Route A.
Above shows the latest position with regards to the Link Road with Route A being the explored option
At present the Tees Valley Combined Authority is consulting on its Strategic Transport Strategy which includes the Darlington Northern Link Road but, given that this road has already received funding for an Enhanced Strategic Outline Business Case to be prepared it is highly unlikely that it will be removed from the strategy.
At the moment this proposal is on hold to await the outcome of the Local Plan before it can finalise how the road is to be funded.
Whinfield Residents Association will keep you updated on its progress.